<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>untapped-resources</title>
    <link>https://www.untapped.com.au</link>
    <description />
    <atom:link href="https://www.untapped.com.au/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>Maintenance Planning and Scheduling</title>
      <link>https://www.untapped.com.au/maintenance-planning-and-scheduling</link>
      <description>Our client’s Pilbara operations require experienced maintenance planners and schedulers to maintain work readiness and support maintenance execution. Attracting and retaining skilled practitioners, covering leave and vacancies, and responding to changing workloads creates ongoing resource pressures.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Flexible maintenance planning and scheduling support to maintain operational continuity and improve work readiness.
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client’s Pilbara operations require experienced maintenance planners and schedulers to maintain work readiness and support maintenance execution. Attracting and retaining skilled practitioners, covering leave and vacancies, and responding to changing workloads creates ongoing resource pressures.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Site accommodation and flight availability can further constrain access to resources. Operations require flexible support that integrates quickly into existing teams and systems, while balancing cost, continuity and the need for site presence.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Untapped provides experienced maintenance planners and schedulers through remote, hybrid and fully on-site arrangements, tailored to operational requirements. Practitioners work within Rio Tinto’s systems and work management processes, supporting both short-term coverage and ongoing placements.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The scope of support includes:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Developing maintenance work packs, including scope, labour, materials and service requirements.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Preparing schedules aligned with operational priorities and available resources.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Reviewing backlogs and progressing work orders to execution readiness.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Working with maintenance, operations and supply teams to resolve constraints.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Supporting SAP master data improvements where required.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Remote delivery provides ongoing coverage with site visits tailored to operational needs. Hybrid arrangements combine remote support with regular site attendance, while fully on-site practitioners embed directly within operational teams. Practical knowledge sharing supports site personnel throughout the engagement.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The delivery model provides flexible access to experienced practitioners and supports continuity of maintenance planning and scheduling.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Key benefits include:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Coverage during vacancies, leave and periods of increased workload.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Improved visibility of work readiness and maintenance resource requirements.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Consistent planning and scheduling practices aligned with site processes.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Access to additional expertise and coverage as operational priorities change.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Reduced demand for flights and accommodation where remote delivery is suitable.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Practical knowledge transfer to support site planning capability. 
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-maintenance-planning-and-scheduling-fa12386c.jpg" length="266709" type="image/jpeg" />
      <pubDate>Thu, 26 Nov 2026 01:27:23 GMT</pubDate>
      <guid>https://www.untapped.com.au/maintenance-planning-and-scheduling</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-maintenance-planning-and-scheduling-fa12386c.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-maintenance-planning-and-scheduling-fa12386c.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Coal Wagon Age-Based SM Framework</title>
      <link>https://www.untapped.com.au/coal-wagon-age-based-sm-framework</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Improving predictability, efficiency and cost effectiveness&amp;#11;of Scheduled Maintenance activities.
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client operate a diverse fleet of haulage wagons across their Australian rail network. As some of their coal wagon fleet approaches the midway point of its lifecycle, unplanned parts and labour requirements placed additional risk into the Scheduled Maintenance (SM) program.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client engaged Untapped to build an age-based SM program, forecasting parts and labour requirements into repeatable job plans.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Focus areas included:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Material requirements
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Labour forecasting
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Component replacement based on historical data
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Repeatable job plans and inspection sheets
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           A phased approach was designed to build an SM framework from historical data, allowing the client distinct approval and engagement points to ensure the solution was owned and implemented.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Significant data analysis was undertaken to identify material usage aligning with the SM frequency of 3 to 4 years. Key materials were identified and their optimum planned quantities captured. This formed a series of future component plans.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Labour requirements were established for these component replacements. Cost models were built to forecast labour and material spend over the remaining life.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Once component replacement was finalised, visual inspection and measurement tasks were identified using the maintenance manual library, and converted into service sheets for each SM frequency.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Forward planning of component replacements allow:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Budgeting
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Forecast of materials for suppliers
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Labour requirements
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Labour levelling across other wagon fleets
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Building inspection sheets creates:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Consistent application of the maintenance manuals for each scheduled maintenance activity
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Accountability of maintainers at sign off
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Clearer direction for maintainers of what inspection or measurement tasks are required
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-coal-wagon-age-based-sm-framework-06556aec.jpg" length="387852" type="image/jpeg" />
      <pubDate>Thu, 26 Nov 2026 01:00:40 GMT</pubDate>
      <guid>https://www.untapped.com.au/coal-wagon-age-based-sm-framework</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-coal-wagon-age-based-sm-framework-06556aec.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-coal-wagon-age-based-sm-framework-06556aec.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>ECI Inspection Program</title>
      <link>https://www.untapped.com.au/eci-inspection-program</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Asset inspections to deliver improved SAP master data, compliance and management of assets.
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           In Queensland, mining operations and associated activities are authorised under an Environmental Authority (EA). EA conditions require that Environment Critical Infrastructure (ECI) is appropriately installed, operated, maintained and ultimately decommissioned in accordance with site-specific approval conditions. Our client commissioned Untapped to develop and conduct a Water ECI Assessment Program across its operations to validate ~2000 water ECI assets with a view to uplifting SAP master data. Presently, two sites have been completed, with the remaining sites being planned.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The scope of work encompassed a comprehensive current state assessment of the Water ECI inventory at the mining operation, commencing with a pilot site to test the audit methodology. Our approach covered the following key activities:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ol&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Comprehensive review of existing ECI master data and documentation.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Develop a detailed inspection plan and schedule, including identification of asset locations, and preparation of Inspectivity (digital data collection platform). 
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            On-site physical asset inspections, including:
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Validating that the asset exists and confirmation of its location;
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Obtaining supplementary field data for future SAP master data uplift;
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Capturing pictures of the asset to show its condition.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Develop an audit report including findings and recommendations to close gaps. 
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ol&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           This work is completed in collaboration with central and site teams, drawing on stakeholder input and operational data to ensure the audit delivers practical and sustainable outcomes.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           A measurable improvement in shutdown performance, owned by site teams and sustained beyond the coaching engagement.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Reduced shutdown overrun hours and more efficient resourcing.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Improved safety, productivity, quality and cost performance.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Progressive improvement in shutdown maturity from one shutdown to the next.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Process conformance maintained at or above the 85% target.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Improvement actions completed and owned by site teams.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Sustained site capability built through observation, coaching and influence.
            &lt;br/&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-eci-inspection-program-1617e513.jpg" length="956657" type="image/jpeg" />
      <pubDate>Thu, 26 Nov 2026 00:51:59 GMT</pubDate>
      <guid>https://www.untapped.com.au/eci-inspection-program</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-eci-inspection-program-1617e513.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-eci-inspection-program-1617e513.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Critical Minerals Mining Panel Relocation Plans</title>
      <link>https://www.untapped.com.au/critical-minerals-mining-panel-relocation-plans</link>
      <description>Equipment relocation is a recurring requirement at our client’s mine in south-western New South Wales. The operation uses specialised horizontal directional drilling rigs, supported by mud processing facilities known as “Mud City” and Mobile Mining Plants (MMPs).</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Baseline relocation documentation improves safety, strengthens planning and reduces downtime.
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Equipment relocation is a recurring requirement at our client’s mine in south-western New South Wales. The operation uses specialised horizontal directional drilling rigs, supported by mud processing facilities known as “Mud City” and Mobile Mining Plants (MMPs). As mining progresses, these assets must move between drill locations and mining panels. Our client engaged Untapped to develop a consistent approach to these moves, with clear task sequencing, labour and tooling requirements, and safety considerations to help minimise production downtime.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           As a greenfield operation, the operations equipment layouts, work practices and resource requirements were still evolving. Each asset presented different planning challenges, including changes to Mud City positioning and the effect of spare sump availability on MMP relocation duration. The documentation needed to capture current knowledge while remaining adaptable as the site gained operating experience.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Untapped combined field observation, stakeholder consultation and technical document review across three site visits between September 2025 and March 2026. We inspected equipment, observed two drill rig relocations, participated in relocation planning and execution exercises, and gathered input from drilling crews, maintenance, projects and planning personnel. Existing drawings, schedules, design reports and original equipment manufacturer information provided the technical foundation for the work.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           For each asset type, we developed linked Gantt schedules, task and resource summaries, and full relocation procedures, supported by in-field images. Alternative schedules addressed one-off layout transitions and moves, with and without spare infrastructure. Drill rig deliverables also captured lessons learnt and maintenance opportunities that could be completed alongside relocation work. Draft documents were issued for stakeholder review and refined using relocation feedback where available, with a structured feedback form established to support future updates.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client received a coordinated baseline documentation suite covering drill rigs, Mud City and MMP relocations. The packages bring task sequencing, resourcing and procedural guidance together, providing a repeatable foundation for planning future moves. Drill rig and Mud City documentation incorporated feedback from actual relocation activities, while the alternative MMP schedules provided a basis for assessing the operational implications of spare sump availability. All documents were handed over in final-draft status for Iluka’s approval.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The engagement also identified practical opportunities to strengthen relocation delivery, including further development of safety documentation, follow-through on isolation and tooling improvements, clearer allocation of responsibilities, and better use of SAP to coordinate relocations with maintenance. Together, the deliverables and improvement opportunities established a foundation for more consistent relocation planning and ongoing refinement as the mine moves towards steady-state production.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-critical-minerals-mining-panel-relocation-plans-a82ca51b.jpg" length="574585" type="image/jpeg" />
      <pubDate>Mon, 23 Nov 2026 01:31:50 GMT</pubDate>
      <guid>https://www.untapped.com.au/critical-minerals-mining-panel-relocation-plans</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-critical-minerals-mining-panel-relocation-plans-a82ca51b.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-critical-minerals-mining-panel-relocation-plans-a82ca51b.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Locomotive Whole of Life Analysis</title>
      <link>https://www.untapped.com.au/locomotive-whole-of-life-analysis</link>
      <description>Our clients Queensland operation needed to balance locomotive reliability, performance and maintenance expenditure across the remaining life. With operating requirements of approximately 7,300 hours per year, the review needed to consider both production through to 2030 and a longer-term, cost-conscious approach.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Whole of Life review provides clarity for cost forecasting and maintenance planning.
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our clients Queensland operation needed to balance locomotive reliability, performance and maintenance expenditure across the remaining life. With operating requirements of approximately 7,300 hours per year, the review needed to consider both production through to 2030 and a longer-term, cost-conscious approach to supporting mine closure activities through to 2040. Untapped was engaged to review whole-of-life plans and explore major component strategies suited to these changing requirements.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Differences in maintenance regimes and gaps in component information limited the visibility of future expenditure. Major component replacements were split between standalone plans and larger service packages, making costs difficult to isolate and forecast. Alongside different servicing terminology and intervals between locos, it was difficult to compare strategies and establish a consistent planning baseline.
           &lt;br/&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Untapped reviewed the locomotives’ servicing regimes, available major component information and replacement costs to identify planning gaps and improvement opportunities. We mapped R1005’s component replacement intervals against its maintenance schedule and compared this structure with R1007’s calendar-based servicing regime. The review also drew on reliability findings across key systems, including air conditioning, braking air supply, diesel power units, auxiliary power, wheelsets and bogies, to connect whole-of-life planning with practical maintenance improvements.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           We developed a forecasting tool to model major component expenditure through to 2040. The tool allows users to adjust annual operating hours, last component change-out dates and replacement intervals, with separate assumptions for pre-2030 and post-2030 operation. Component-level costs and cumulative expenditure graphs provide a way to explore alternative scenarios and understand their financial implications.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client received a clearer view of the gaps affecting locomotive lifecycle planning and a practical tool for exploring future major component expenditure. The forecasting model provides a foundation for comparing replacement scenarios and assessing the implications of changing utilisation and maintenance intervals. Its separation of pre-2030 and post-2030 assumptions supports a deliberate transition from production-focused reliability to cost optimisation during closure support.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The review established an actionable improvement plan: define major component change-outs in the CMMS, standardise servicing terminology and structure, and separate component replacements from service packages where appropriate. It also recommended detailed failure and life analysis, including Weibull modelling, to validate opportunities for extending replacement intervals.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Together, these deliverables provide a stronger foundation for transparent forecasting and evidence-based maintenance decisions, with future savings and reliability benefits dependent on implementation and validation.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-locomotive-whole-of-life-analysis-e8a4086b.jpg" length="373899" type="image/jpeg" />
      <pubDate>Sat, 21 Nov 2026 01:39:31 GMT</pubDate>
      <guid>https://www.untapped.com.au/locomotive-whole-of-life-analysis</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-locomotive-whole-of-life-analysis-e8a4086b.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-locomotive-whole-of-life-analysis-e8a4086b.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Shutdown Leading Practice</title>
      <link>https://www.untapped.com.au/shutdown-leading-practice</link>
      <description>The client identified a significant opportunity to improve fixed-plant shutdown performance across its Pilbara operations.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Embedding leading practices to improve shutdown performance.
          &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The client identified a significant opportunity to improve fixed-plant shutdown performance across its Pilbara operations. Shutdown overrun hours had increased by 49% since 2018, while resourcing levels exceeded requirements by up to 30%. The source estimated that overruns and excess labour represented a potential annual cost exposure of up to $694 million.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Washdowns, permitting and scheduling accounted for more than 75% of activity delays. Although a shutdown procedure and leading-practice playbook were in place, site practices varied and were not consistently embedded in day-to-day work.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           For example, three versions of the wash sheet were in use, wash plans were not aligned with the Gantt schedule, ownership was unclear, and sign-off was inconsistent.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Embedded Shutdown Advisors focused on frontline execution and targeted coaching, with particular emphasis on leadership, mindsets and behaviours.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Working within each site’s shutdown planning and execution teams across the full shutdown cycle—from T‑13 through to the post-shutdown review—coaches used structured field observations, stakeholder interviews and site process reviews to identify gaps against the shutdown playbook’s winning conditions.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Shutdown Coaches engaged shutdown, maintenance, operations and planning Superintendents and Managers to agree priorities and take ownership of tailored improvement actions. Site teams were coached to adopt and sustain the seven leading practices, with actions maintained in the shutdown improvement register and progress reported from one shutdown to the next. Successful practices from one site were captured and replicated across the operations.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           A measurable improvement in shutdown performance, owned by site teams and sustained beyond the coaching engagement.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Reduced shutdown overrun hours and more efficient resourcing.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Improved safety, productivity, quality and cost performance.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Progressive improvement in shutdown maturity from one shutdown to the next.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Process conformance maintained at or above the 85% target.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Improvement actions completed and owned by site teams.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Sustained site capability built through observation, coaching and influence.
            &lt;br/&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-shutdown-leading-practice-f817cf37.jpg" length="411834" type="image/jpeg" />
      <pubDate>Thu, 19 Nov 2026 00:29:13 GMT</pubDate>
      <guid>https://www.untapped.com.au/shutdown-leading-practice</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-shutdown-leading-practice-f817cf37.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-shutdown-leading-practice-f817cf37.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Infrastructure Asset Maintenance Requirements</title>
      <link>https://www.untapped.com.au/regulatory-requirements-mapped-to-infrastructure-assets</link>
      <description>Our client operates more than 80 sites across Australia, ranging from small modular buildings to complex operational facilities. They proactively identified that outside of rail track maintenance standards, infrastructure asset maintenance lacked a structured approach, resulting in limited clarity on maintenance.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Regulatory requirements mapped to infrastructure assets to improve baseline maintenance. 
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client operates more than 80 sites across Australia, ranging from small modular buildings to complex operational facilities. They proactively identified that outside of rail track maintenance standards, infrastructure asset maintenance lacked a structured approach, resulting in limited clarity on maintenance requirements and their role in supporting asset lifecycles.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Untapped were engaged to assess the relevant asset classes and review compliance against regulatory standards as applicable to allow a review and uplift of baseline maintenance for infrastructure across the network.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Statutory guidance can sometimes be subject to interpretation, so it was important to extract information directly and present in a clear way to best inform our client’s maintenance professionals.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           A structured framework and methodology was developed that captured and assessed all infrastructure asset classes and their required maintenance strategies and tactics against relevant Australian Standards and other codes. 
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Over 25 asset classes, comprising ~8000 subsystems, were mapped to National and State regulatory requirements, with a detailed output developed that provided the client with asset classifications, maintenance tasks, intervals, and compliance references.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           This output allowed direct comparison with current maintenance practices within the business and the required detail to update the CMMS as required.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Complete infrastructure review Australia wide
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Over 25 asset classes analysed comprising ~8000 subsystems
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            ~50 Australian Standards, ~10 Codes of Practice and 3 guidelines comprehensively reviewed
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Full baseline maintenance requirements extracted and presented for direct comparison to current state
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Details identified for future CMMS uplift
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Full traceability from maintenance requirement, applicable document section/clause, applicable maintainable item
            &lt;br/&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-infrastructure-asset-maintenance-requirements.jpg" length="395364" type="image/jpeg" />
      <pubDate>Fri, 13 Nov 2026 01:12:56 GMT</pubDate>
      <guid>https://www.untapped.com.au/regulatory-requirements-mapped-to-infrastructure-assets</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-infrastructure-asset-maintenance-requirements.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-infrastructure-asset-maintenance-requirements.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Caterpillar 793F Component Extension</title>
      <link>https://www.untapped.com.au/caterpillar-793f-component-extension</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Haul Fleet life extension, capital expenditure deferral,&amp;#11;reduced maintenance cost and reduced risk exposure.
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client operates over 250 Caterpillar 793F haul trucks across coal and iron ore operations in Australia. Caterpillar had identified an opportunity, as part of their continuous improvement initiatives, to extend the transmission life from 18,000 to 24,000 hours due to upgraded internal components.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Moving the replacement strategy for the transmission altered the optimum park up point for the life of the truck by approximately 2 years. Untapped were engaged by a Tier-1 Miner to perform maintenance strategy and service optimisation review to risk assess and realise the life extensions of the 793F trucks.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Untapped led onsite workshops to review component life, service requirements and key risks associated with the component extensions. Where required, some component lives were reduced to better align with the new major maintenance schedule and to manage risk.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Actions were taken during the workshops to follow up with OEM and site personnel to revise service requirements. Untapped collated all information and created the change requirement notices to realise the master data changes in the CMMS.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Working across multiple sites and functional teams, stakeholder engagement was integral to the success of the project. Untapped coordinated communications and updates with the support of the project sponsor.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Components assessed for failure history, failure rates and tear down condition
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            OEM engagement for optimised service tasks to mitigate risks
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Realigned whole of life planning 
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            ~11% reduction in whole of life maintenance spend (~$25M)
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Fleet uptime increase of ~5200 hours
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            ~30% reduction in maintainer exposure activities
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            ~$1.1B capital expenditure deferral through extended fleet life
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Realisation of ~$190M residual asset component life
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-caterpillar-793f-component-extension.jpg" length="330384" type="image/jpeg" />
      <pubDate>Thu, 12 Nov 2026 01:03:31 GMT</pubDate>
      <guid>https://www.untapped.com.au/caterpillar-793f-component-extension</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-caterpillar-793f-component-extension.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-caterpillar-793f-component-extension.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Mobile Fleet Spares Review</title>
      <link>https://www.untapped.com.au/mobile-fleet-spares-review</link>
      <description>Our client operates asset intensive mines in remote locations across Northern Australia. Several mines had significant challenges with material spares across priority, high use fleets such as loaders, haul trucks and locomotives.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Material Spares Analysis supports stocking changes, criticality review and reduction in emergency freight.
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client operates asset intensive mines in remote locations across Northern Australia. Several mines had significant challenges with material spares across priority, high use fleets such as loaders, haul trucks and locomotives. 
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Most challenges relate to stocking strategies, with heavy use of express freight required to compensate for reduced onsite stock. Material criticality values were largely set when equipment was first delivered to site and had not been updated based on new operational context.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The use of direct purchase materials varied across sites, with material cataloguing becoming the responsibility of site personnel as part of their normal routines, but often not prioritised due to the time required to complete. Material contracts are in place but there is significant opportunity to place more high use materials on contract, reducing costs and improving surety of supply.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Untapped was engaged to review material spares data and provide recommendations to uplift material and logistics challenges.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            CMMS SAP Data downloaded for multiple transactions, reviewing work order and material order history.
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            In-depth analysis across a range of materials functions, such as:
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Material criticality values
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Materials on Contract
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Planned/forecast materials (primary maint.)
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Current Stock on Hand and warehouse min/max
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Usage
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Direct purchasing
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Emergency freight
            &lt;br/&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           A range of recommendations were brought forward through the data analysis findings to reduce downtime and improve costs through better materials management.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Other key outcomes included:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Several thousand materials reviewed across multiple sites
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Criticality mismatches identified based on price and impact
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Stocking strategy reviewed for high use materials, particularly on secondary and breakdown orders
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Contract spend highlighted and further materials identified to place on contract
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Improved defect identification processes to reduce reliance on emergency freight
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-mobile-fleet-spares-review-9e5fd238.jpg" length="447617" type="image/jpeg" />
      <pubDate>Wed, 11 Nov 2026 01:22:53 GMT</pubDate>
      <guid>https://www.untapped.com.au/mobile-fleet-spares-review</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-mobile-fleet-spares-review-9e5fd238.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-mobile-fleet-spares-review-9e5fd238.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Heavy Excavator (Liebherr and Caterpillar) Equipment Strategy</title>
      <link>https://www.untapped.com.au/heavy-excavator-liebherr-and-caterpillar-equipment-strategy</link>
      <description>Our client sought to develop comprehensive and standardised equipment strategies for its heavy excavator fleets, reducing maintenance costs and downtime while improving reliability and availability.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Optimising excavator maintenance strategies, whole-of-life costs, reliability and availability.
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client sought to develop comprehensive and standardised equipment strategies for its heavy excavator fleets, reducing maintenance costs and downtime while improving reliability and availability.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Untapped provided technical leadership within the Maintenance Team, working with site specialists and OEMs to align maintenance practices and optimise whole-of-life asset performance.
           &lt;br/&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Reviewed SAP maintenance history, fleet performance, failure modes, OEM recommendations and existing maintenance strategies to identify cost and reliability improvement opportunities.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Developed component replacement and modular shutdown strategies, including optimised engine midlife and powertrain intervals, servicing tasks and condition monitoring requirements.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Modelled maintenance costs, downtime and whole-of-life scenarios to evaluate strategy changes. Developed standardised SAP master data, service sheets, task lists and deployment plans.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           The revised strategies were deployed at the completion of each fleet type, with governance handed over to site and functional teams as required. Key outcomes included:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Optimised major powertrain shutdown intervals
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Extended modelled whole-of-life asset utilisation
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Indicative reductions in annualised material costs
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Forecast improvement in fleet availability
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Standardised maintenance strategies and SAP master data
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Delivered the strategy, supporting cost models and deployment documentation, with outstanding material supply actions identified for follow-up.
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-heavy-excavator-liebherr-and-caterpillar-equipment-strategy.jpg" length="206089" type="image/jpeg" />
      <pubDate>Mon, 02 Nov 2026 06:10:10 GMT</pubDate>
      <guid>https://www.untapped.com.au/heavy-excavator-liebherr-and-caterpillar-equipment-strategy</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-heavy-excavator-liebherr-and-caterpillar-equipment-strategy.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-heavy-excavator-liebherr-and-caterpillar-equipment-strategy.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Liebherr R9800 Engine Repower Assessment</title>
      <link>https://www.untapped.com.au/liebherr-r9800-engine-repower-assessment</link>
      <description>Our client operated four Liebherr R9800 excavators at a Queensland coal mine. The Penske-powered machine consistently underperformed against site and OEM targets, with engine-related reliability issues contributing to lost production and elevated maintenance expenditure.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
           Engine maintenance cost benchmarking and life cycle options assessment to improve excavator availability and production.
          &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Challenges &amp;amp; Context
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Our client operated four Liebherr R9800 excavators at a Queensland coal mine. The Penske-powered machine consistently underperformed against site and OEM targets, with engine-related reliability issues contributing to lost production and elevated maintenance expenditure.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           In 2018, the machine achieved 78.5% availability against a 90% target. Its actual maintenance expenditure was approximately four times that of the Cummins-powered Unit. Untapped supported the client’s Maintenance Team to assess the most cost-effective repower option.
           &lt;br/&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Approach
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Untapped analysed historical SAP work orders, equipment downtime and BOM data, separating engine and non-engine expenditure and comparing maintenance costs and events across the Penske and Cummins configurations.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Engagement with site maintenance teams, OEMs, finance and technical specialists informed the assessment of six options, including retaining the existing engine configuration, repowering and machine replacement.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           A ten-year life cycle cost forecast compared maintenance expenditure per utilised hour, upfront investment and production performance. Assumptions included midlife and engine replacement intervals, expected asset life and availability.
           &lt;br/&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h4&gt;&#xD;
    &lt;span&gt;
           Outcomes
           &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h4&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Recommended a full Cummins repower in accordance with Liebherr’s proposal, supported by an OEM availability guarantee. Forecast benefits included:
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            ~37% reduction in maintenance spend per utilised hour over ten years
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            ~750 additional operating hours per annum
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            ~1.8 million BCM annual production uplift
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Approximately eight-month payback
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
            Fleet standardisation and potential spares consolidation
           &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           Delivered a decision paper, supporting cost model and implementation recommendations to inform the investment decision.
          &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-liebherr-r9800-engine-repower-assessment.jpg" length="184147" type="image/jpeg" />
      <pubDate>Sun, 01 Nov 2026 06:12:58 GMT</pubDate>
      <guid>https://www.untapped.com.au/liebherr-r9800-engine-repower-assessment</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-liebherr-r9800-engine-repower-assessment.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/def2eecd/dms3rep/multi/untapped-case-studies-liebherr-r9800-engine-repower-assessment.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
