Our client operates over 250 Caterpillar 793F haul trucks across coal and iron ore operations in Australia. Caterpillar had identified an opportunity, as part of their continuous improvement initiatives, to extend the transmission life from 18,000 to 24,000 hours due to upgraded internal components.


Moving the replacement strategy for the transmission altered the optimum park up point for the life of the truck by approximately 2 years. Untapped were engaged by a Tier-1 Miner to perform maintenance strategy and service optimisation review to risk assess and realise the life extensions of the 793F trucks.


Approach

Untapped led onsite workshops to review component life, service requirements and key risks associated with the component extensions. Where required, some component lives were reduced to better align with the new major maintenance schedule and to manage risk.


Actions were taken during the workshops to follow up with OEM and site personnel to revise service requirements. Untapped collated all information and created the change requirement notices to realise the master data changes in the CMMS.

Working across multiple sites and functional teams, stakeholder engagement was integral to the success of the project. Untapped coordinated communications and updates with the support of the project sponsor.


Outcomes

  • Components assessed for failure history, failure rates and tear down condition
  • OEM engagement for optimised service tasks to mitigate risks
  • Realigned whole of life planning 
  • ~11% reduction in whole of life maintenance spend (~$25M)
  • Fleet uptime increase of ~5200 hours
  • ~30% reduction in maintainer exposure activities
  • ~$1.1B capital expenditure deferral through extended fleet life
  • Realisation of ~$190M residual asset component life

Explore More of Our Work

Large industrial turbine with curved metal blades and yellow machinery components in a factory setting.
26 November 2026
Our client’s Pilbara operations require experienced maintenance planners and schedulers to maintain work readiness and support maintenance execution. Attracting and retaining skilled practitioners, covering leave and vacancies, and responding to changing workloads creates ongoing resource pressures.
26 November 2026
Improving predictability, efficiency and cost effectiveness of Scheduled Maintenance activities.
26 November 2026
Asset inspections to deliver improved SAP master data, compliance and management of assets.