International Miner
ECI Inspection Program
Asset inspections to deliver improved SAP master data, compliance and management of assets.
Challenges & Context
In Queensland, mining operations and associated activities are authorised under an Environmental Authority (EA). EA conditions require that Environment Critical Infrastructure (ECI) is appropriately installed, operated, maintained and ultimately decommissioned in accordance with site-specific approval conditions. Our client commissioned Untapped to develop and conduct a Water ECI Assessment Program across its operations to validate ~2000 water ECI assets with a view to uplifting SAP master data. Presently, two sites have been completed, with the remaining sites being planned.
Approach
The scope of work encompassed a comprehensive current state assessment of the Water ECI inventory at the mining operation, commencing with a pilot site to test the audit methodology. Our approach covered the following key activities:
- Comprehensive review of existing ECI master data and documentation.
- Develop a detailed inspection plan and schedule, including identification of asset locations, and preparation of Inspectivity (digital data collection platform).
- On-site physical asset inspections, including:
- Validating that the asset exists and confirmation of its location;
- Obtaining supplementary field data for future SAP master data uplift;
- Capturing pictures of the asset to show its condition.
- Develop an audit report including findings and recommendations to close gaps.
This work is completed in collaboration with central and site teams, drawing on stakeholder input and operational data to ensure the audit delivers practical and sustainable outcomes.
Outcomes
A measurable improvement in shutdown performance, owned by site teams and sustained beyond the coaching engagement.
- Reduced shutdown overrun hours and more efficient resourcing.
- Improved safety, productivity, quality and cost performance.
- Progressive improvement in shutdown maturity from one shutdown to the next.
- Process conformance maintained at or above the 85% target.
- Improvement actions completed and owned by site teams.
- Sustained site capability built through observation, coaching and influence.